Signature Global

Faq's

1. Location of the project

Sector-95, Gurugram

2. USP of project location
  • Easy and smooth connectivity from Pataudi Road, Dwarka Expressway, NH-8, KMP Expressway and IGI Airport
  • 11 Km from Sultanpur National Park
  • 30 Km from IGI Airport
  • 25 Km from Delhi
  • 30 Minutes from AIIMS National Cancer Institute, Badsa, Jhajjar 15 Minutes from IMT Manesar
  • Premium residential colonies and commercial project in close proximity
  • Schools like Sharda International School, Colonel’s Public School in close proximity.
  • Proximity to Kamla Hospital
3. Area being offered in Sq.ft.
S.No Category No. of Units
1 2BHK TYPE-1 170
2 2BHK TYPE-2 170
3 2BHK TYPE-3 130
4 2BHK TYPE-4 170
5 2BHK TYPE-5 40
6 2BHK TYPE-07 21
4. Parking type/ area

Visitor’s Car Parking & Reserved 2 wheeler parking

5. Project Area/ No of Flats

5.1125 Acres (Plot Area)/(No of Flats) 738

6. Commercial

Signum 95, 72 (No of Shops)

7. Power backup

Residential-common area 50%; commercial 100%

8. Crèche cum Anganbadi

Available (2000 sq.ft. each)

9. Community Hall

Available (2000 sq.ft. each)

10. Lift

Available

12. Banking Partner

Yes Bank, ICICI Bank, TATA Capital Home Loans, IIFL Home Loan, PNB Housing, ART, Aditya Birla Capital, Shubam, Capri Home Loans, Piramal Capital and Housing Finance, ICICI Home finance, HDFC.

13. Launch Date

16 Nov 2019

14. Possession Date

Within four years from approval of building plans or grant of environmental clearance, whichever is later.

15. Surrender Process

In case of surrender/cancellation of flat by a successful applicant, following amount shall be forfeited in addition to Rs. 25,000/- along with applicable taxes/charges/fee etc:

S. No. PARTICULAR AMOUNT TO BE FORFEITED
1 In case of surrender/cancellation before the commencement of project Nil
2 Upto 1 year from the date of commencement of project 1% of the cost of flat
3 Upto 2 years from the date of commencement of project 3% of the cost of flat
4 After 2 years from the date of commencement of project 5% of the cost of flat

Such flats, (after surrender/cancellation) may be considered to offer those applicants, if any, falling in the waiting list or may be allotted in term of amended affordable housing policy.

16. Penalty Clause

Any default in payment shall invite penal interest as provided in Rule 15 of the Haryana Real Estate Regulatory Authority, Rules 2017.

17. Maintenance

0 maintenance for 5 years, however operating and running cost has to be paid.

18. Which body will oversee the maintenance after possession

Colonizer will take care of maintenance for 5 years. Post 5 years it will be handed over to RWA.

19. FAR

2.37%

21. Does Haryana Government Sanction this project

This project is governed by the Haryana Government Affordable Housing Project under The Director General, Town and Country Planning.This project is governed by the Haryana Government Affordable Housing Project under The Director General, Town and Country Planning.

22. Nearby Metro Station

Huda City Centre Station

23. Specifications
Drawing / Dining Room
Floor Vitrified Tiles
Ceilng Oil Bond Distemper
Wall Oil Bond Distemper
Bed Room
Floor Vitrified Tiles
Ceilng Oil Bond Distemper
Wall Oil Bond Distemper
Kitchen
Floor Vitrified / Ceramic Tiles
Wall / Ceiling Oil Bond Distemper
Dado Ceramic tiles 600mm above counter
Counter Top Green Marble / Granite
Fittings & Fixtures ISI marked CP Fittings & Single drain board sink
Balconies
Floor AntiSkid / Matt Finish Ceramic Tiles
Railing M S railing with Enamel Paint Finish
Toilet & Bath
Floor Anti Skid Ceramic Tiles
Wall Ceramic Tiles till 4Feet / 7'-0" feet high & Oil Bound Distemper Above
Ceiling Grid Flase Ceiling
Fittings & Fixtures ISI marked CP Fittings ,W.C & Washbasin
Doors & Windows
Internal Doors Frame Hard Wood / Red Merandi
Internal Doors Shutter Main Door - Both Side Laminated Flush Door & Internal Flush Door with Painted finish on Both Side
External Doors & Windows Aluminium Powder Coated /UPVC
Electrical
Wiring Copper Electrical Wiring throughout in concealed conduit for light point
Switches / Socket ISI Marked Switches & Sockets
Terrace Brick Bat Koba or Water Proofing Treatment
Structure EarthQuake Resistant RCC Framed Struture as per Sesmic Zone
External Development
Internal Roads Tremix Concrete Road / Interlocking Blocks
Boundary Wall RCC / Brick wall with Plaster & External weather Proof Paint Finish
External Development Weather Proof Texture Paint in Buildings

Landscape features:

  • Jogging track
  • Skating rink
  • Outdoor sitting area
  • Outdoor GYM
  • Kids' play area
  • Meditation garden
  • Club party lawn
  • Water feature